templo
Underside of roof
templo
Again, the roof
templo
Caio and Lama Norbu working on the roof details
templo
Corner view of inclined wall
templo
From a far
templo
Preparing for roof details
templo
Roof from front
templo
Storm background
templo
Temple in trees
templo
Window details on cupola
templo
Installing window details
templo
Installing the first window detail
templo
Roof outlines
templo
Visualizing the roof
templo
Back view of the roof
templo
Checking the first corner
templo
Millimetric alignment
templo
Our cool welder
templo
Roof beam
templo
Setting the first corner
templo
The top roof beam
templo
The walls are growing
templo
The sangha with Lama Padma Dorje
templo
Riwo Sangtchod puja
templo
Pouring the last level
templo
First teaching
templo
Finished window details
templo
As of April 30 2005
templo
Bees nest (chötse)
templo
Window detail finished!
templo
First puja
templo
Making bees nest detail
templo
Pouring the shrineroom
templo
Shrineroom floor!
templo
Landscape vision for the temple
templo
The second level 2
templo
Retaining wall
templo
Narcisio, The Man
templo
View from the shrineroom
templo
Francisco sets up his equipment
templo
Foaming the cement
templo
The walls is growing 2
templo
The walls is growing
templo
The second level, 04/02/05
templo
29. Model of temple roof, 27/01/05
templo
28. Designing the roof, 27/01/05
templo
27. Digging the foundation
templo
26. Christine paints the window's patterns, 27/01/05
templo
25. The columns are rising, 10/01/05
templo
24. Pouring the foundation, 7/12/04
templo
23. Lama Tsering watches , 7/12/04
templo
22. Foundation Forms, 2/12/04
templo
21. Tent removal, 11/23
templo
20. Setting the sapata forms, 11/23
templo
19. Starting the sapatas, 11/23
templo
18. Rains arrive, 11/17
templo
17. Pattern for the window, 11/18
templo
16. Designing the window details, 11/13
templo
15. Tigle and the sangha, 11/12
templo
14. Setting the peace vases, 11/12
templo
13. Concrete arrives, 11/8
templo
12. Fabio and Andrea..., 11/8
templo
11. Drilling begins, 11/8
templo
10. Displaced tent, 11/8
templo
9. Excavation continues, 10/18
templo
8. Earthmoving, 10/18
templo
7. Digging begins, 10/18
templo
6. Laying out the site, 10/7
templo
5. Moving the mango tree, 9/11
templo
4. Moving the chestnut tree, 9/11
templo
3. Blessing the land, 9/6
templo
2. Soil Testing,4/26
templo
1. Jigme Rinpoche leads..., 1/24