 |
| Underside of roof |
 |
| Again, the roof |
 |
| Caio and Lama Norbu working on the roof details |
 |
| Corner view of inclined wall |
 |
| From a far |
 |
| Preparing for roof details |
 |
| Roof from front |
 |
| Storm background |
 |
| Temple in trees |
 |
| Window details on cupola |
 |
| Installing window details |
 |
| Installing the first window detail |
 |
| Roof outlines |
 |
| Visualizing the roof |
 |
| Back view of the roof |
 |
| Checking the first corner |
 |
| Millimetric alignment |
 |
| Our cool welder |
 |
| Roof beam |
 |
| Setting the first corner |
 |
| The top roof beam |
 |
| The sangha with Lama Padma Dorje |
 |
| As of April 30 2005 |
 |
| Bees nest (chötse) |
 |
| Window detail finished! |
 |
| First puja |
 |
| Making bees nest detail |
 |
| Pouring the shrineroom |
 |
| Shrineroom floor! |
 |
| Landscape vision for the temple |
 |
| The second level 2 |
 |
| Retaining wall |
 |
| Narcisio, The Man |
 |
| View from the shrineroom |
 |
| Francisco sets up his equipment |
 |
| Foaming the cement |
 |
| The walls is growing 2 |
 |
| The walls is growing |
 |
| The second level, 04/02/05 |
 |
| 29. Model of temple roof, 27/01/05 |
 |
| 28. Designing the roof, 27/01/05 |
 |
| 27. Digging the foundation |
 |
| 26. Christine paints the window's patterns, 27/01/05 |
 |
| 25. The columns are rising, 10/01/05 |
 |
| 24. Pouring the foundation, 7/12/04 |
 |
| 23. Lama Tsering watches , 7/12/04 |
 |
| 22. Foundation Forms, 2/12/04 |
 |
| 21. Tent removal, 11/23 |
 |
| 20. Setting the sapata forms, 11/23 |
 |
| 19. Starting the sapatas, 11/23 |
 |
| 18. Rains arrive, 11/17 |
 |
| 17. Pattern for the window, 11/18 |
 |
| 16. Designing the window details, 11/13 |
 |
| 15. Tigle and the sangha, 11/12 |
 |
| 14. Setting the peace vases, 11/12 |
 |
| 13. Concrete arrives, 11/8 |
 |
| 12. Fabio and Andrea..., 11/8 |
 |
| 11. Drilling begins, 11/8 |
 |
| 10. Displaced tent, 11/8 |
 |
| 9. Excavation continues, 10/18 |
 |
| 8. Earthmoving, 10/18 |
 |
| 7. Digging begins, 10/18 |
 |
| 6. Laying out the site, 10/7 |
 |
| 5. Moving the mango tree, 9/11 |
 |
| 4. Moving the chestnut tree, 9/11 |
 |
| 3. Blessing the land, 9/6 |
 |
| 2. Soil Testing,4/26 |
 |
| 1. Jigme Rinpoche leads..., 1/24 |